Every DER request is first reviewed for generation output capacity within our system 和 then we assess the impacts of the request on our grid. 我们考虑的因素是地理位置, 发电机类型, 预期用途和建议的功率输出. 请参阅 分布式能源连接过程接受的 和 ECG0006: 嵌入式发电连接指南 流程和要求.

步骤1 —申请可行性评估:填写 服务申请表格 选择净计量. 15天内(最少), 对于更复杂的项目,最多可达60天), 如果网格中有容量来承载您的DER, 服务布局将生成并发送给您. This layout will include actions that both you 和 真人百家家乐APP下载 are responsible for, including a quotation for the portion of work that will be completed by 真人百家家乐APP下载. 此信息将提供给您或您的承包商, 取决于提交服务请求时包含的联系人. 注意:在列出的馈线上没有容纳der的容量 在这里.

步骤2 -在渥太华水电公司开始工作之前,需要付款. 请注意,服务布局有效期为30天.

步骤3真人百家家乐APP下载 will coordinate with the customer to schedule work based on the service layout outlines. Please note that all preparatory work must be finished 和 the 电气安全 Authority permit to energize must be received to allow for 真人百家家乐APP下载 to complete work 和 energize your system.

步骤1 -完成 初步谘询资料要求(PCIR) 然后发送到 (电子邮件保护),这将为您的项目创建一个唯一的案例编号. For any future communication, please mention the case number in the email subject line. 如果电网有容量的话, you will receive a Preliminary Consultation Report (PCR) identifying early on the obvious technical, 将您提议的DER连接的财务和时间考虑. 真人百家家乐APP下载 will also involve Hydro One 和/or the IESO on behalf of the proponent as needed.

步骤2 —申请连接影响评估(CIA):填写 连接影响评估 申请表. 填写表格的说明可在这里找到 CIA修改指南中央情报局的指令. 请附上技术图纸 提交付款. The application 和 drawings need to be stamped 和 signed by a professional engineer who is licensed in the province of Ontario 和 in good st和ing. 60天内(最少), 对于更大或更复杂的项目更长的时间), 如果电网有容量的话, you will receive the technical assessment 和 requirements with a high level 成本 estimate for the DER to connect. 中央情报局六个月后到期.

注意:请确保案件编号来自以前的信件, 例如初步谘询资料要求, 是否在每封电子邮件或邮寄信件的主题栏中. 回复同一个邮件主题是最好的.

步骤3 – Apply to connect the DER: if you wish to proceed after reviewing the 连接影响评估, 通知 真人百家家乐APP下载 (refer to the PCIR/PCR case number 和 use the same email thread as past) 和 真人百家家乐APP下载 will provide an Offer to Connect  that includes a more detailed scope 和 estimate for 真人百家家乐APP下载’s work to connect.

步骤4 – Sign the Offer to Connect 和 return with payment to 真人百家家乐APP下载 before the expiry date. This will start the process for getting the DER project through construction to in-service. 真人百家家乐APP下载 will arrange a pre-construction meeting to ensure underst和ing of project scope, 时间轴, 成本, 角色和职责以及适用的标准.

步骤5 —准备DER进行调测, 包括获得电气安全管理局的连接授权. 渥太华水电公司必须见证试运行.  Once the DER passes the commissioning 和 the legal agreements with 真人百家家乐APP下载 have been signed by all parties, 渥太华水电公司将允许DER正式开始生产.

连接费用和支付过程

发电机负责某些行政和服务费用, which cover the 成本s of setting up 和 maintaining an account 和 connecting renewable generation projects to 真人百家家乐APP下载's electricity distribution system.

  1. 微型发电(10kw AC或以下)
    帐户设置费用- $27
    每月服务费- $15(每个发电机维修点)

  2. 交流发电量大于10kw
    帐户设置费用- $27
    每月服务费- $80(每发电机维修点)
    行政费*- $151

  3. 水电合同倡议(HCI), Ontario Renewable Energy St和ard Offer Program (RESOP) 和 other energy generators
    帐户设置费用- $27
    每月服务费- $330(每个发电机维修点)
    行政费*- $151
    * This one-time flat charge applies to all new energy resource facilities when t在这里 is an assignment of contracts that requires legal services 和 service entrance assessments by 真人百家家乐APP下载.

自11月1日起, 2021, the monthly service charge no longer be applies to net metered generators until further notice. Future adjustments may be required subject to provincial regulations 和 legislations, 程序的摄入量, 以及行政和运营方面的需要.

  1. 微型发电(10kw AC或以下)

    Assessments to connect these 分布式能源(DERs) are complementary up to three assessments per premise per calendar year are

    Instructions for payment to connect the DERs are provided in the service layout.

  2. 交流发电量大于10kw

    DER Preliminary Consultation Information Requests (PCIR) - complementary up to three assessments per premise per calendar year

    DER Applications for projects greater than 10kW - 真人百家家乐APP下载’s 连接影响评估 (CIA) 成本s are as follows (based on the total DER capacity within the premise):

    • Small generators (≤500 kW connected at <15kV , OR ≤1,000kW if connected at ≥ 15kV): $ 1,000 plus HST
    • 中型发电机(10兆瓦或以下):$ 4,750加HST
    • 大型发电机(大于10兆瓦):$ 5,700加上HST

注意: 根据您的付款方式,请遵循以下说明. T在这里 are different requirements for each payment method (Credit Card, EDI 和 支票). 目前,我们无法接受Interac (e)的付款.转让).

  1. 信用卡网上付款

    • 至: http://ipn.paymentus.com/rotp/hotw
    • 使用“服务发票”选项
    • “参考编号”字段应如下:DER案例编号+ CA.
    • 在开头加零满足 12位数的 长度要求(例如: 0000123456CA)

  2. 电子数据交换(通过网上银行)

    • 如果您已经设置为渥太华水电的收款人, 将渥太华水电公司的客户账号改为:DER案例号+ CA.
    • 在开头加零满足 请填写 长度要求(例如: 000000000000123456CA)

  3. 支票

    If you are not planning to include a hard copy of the paperwork along with the cheque, it is recommended that you submit the necessary paperwork to the DER team via email at (电子邮件保护) 提前保证及时处理.

    • 支票抬头为渥太华水电公司
    • 请在支票/汇款单上注明付款个案编号及地址
    • 付款请邮寄至:
      真人百家家乐APP下载
      邮政信箱8700
      安大略省渥太华
      K1G 3 s4
      美国中央情报局资产管理公司 & 规划

付款通知: 无论付款方式如何, 一旦你付了款, 请发送付款通知邮件至: (电子邮件保护)(电子邮件保护).

Please include your CIA case number 和 address as well as any payment confirmation details (i.e. 付款us确认).

A 备用充电 (fixed 和 variable) applies each month for customers with load displacement generators greater or equal to 500 kW. 的变量 备用充电 is based on contracted st和by dem和 (kW) multiplied by the applicable st和by variable charge listed below. 哪里没有合约待机需求, then the variable 备用充电 is based on the difference of peak dem和 when the load displacement generator is on 和 peak dem和 when the load displacement generator is off multiplied by the applicable st和by variable charge listed below.

有关收费的更多信息,请查看我们的 账单示例细分.

每月服务费:171美元.83

可变收费-一般服务50- 1499千瓦客户:2美元.2930/kW*

可变费用-一般服务1,500-4,999 kW客户:2美元.1033/kW*

可变费用-一般服务大用户客户:$2.3341/kW*

*每千瓦或∙∙∙∙∙∙千伏·A的备用需求计费

This recurring charge is applicable to projects with at least one generating unit from a non-renewable source of 1 MW or more, 或2兆瓦或以上的可再生能源. 有关详情,请参阅 Hydro One网站.

受限馈线列表

The restricted feeders listed apply regardless of the program 和 regardless of the DER energy source type.

下列馈线有短路约束, 因此,任何燃料来源或大小的DER都不能承载在这些馈线上. 初步谘询资料要求(PCIR)  ,以了解是否有其他互连方案.

车站-斯莱特TS:
Feeders: 601, 602, 605, 608, 612, 614, 615, 620, 622, 623, 626, 632, SAT2, TL4TS, TK4TS.

埃尔伍德MTS:
All feeders prefaced by ELW, AN 和 AF; plus feeders AQ01 to AQ07, UA05 to UA07, 和 UZ10 to UZ12.  限制任何由埃尔伍德MTS支持的支线, 例如那些以AE和AJ开头的, 将在DER连接影响评估期间确定.

这份名单将至少每三个月更新一次.

对于热约束的喂食器, 渥太华水电公司将与提议方合作,寻求可接受的解决方案.